See the map in the property photos. As you can see on the FEMA NFHL map, most (if not all) of the property appears to be within the FEMA Floodway. You will not be able to propose any structure or parking within this area without elevating the site. Any proposed development on this lot will require approval from FEMA. Any proposed work within the floodway will require demonstrating no rise in flood levels, no increase in erosive velocity or flow rate, through a flood study prepared by a registered professional engineer. You will not be able to simply elevate the site without demonstrating no adverse impact. May have conservation or mitigation credits value.